Home
 
Information about the Site Bitterfeld

At Akzo Nobels' Base Chemicals site in Bitterfeld about 70 employees are running a chlor-alkali electrolysis based on the modern membrane technology. With a capacity of 75.000 t/a chlorine and 84.500 t/a caustic soda, the plant is integrated into the chemical supply network of the ChemiePark Bitterfeld-Wolfen, a large industrial site in the so called Chemical Triangle between Halle (Saale), Leipzig and Dessau in the east of Germany.

The electrolysis also supplies our production units for hydrogen chloride, hydrocloric acid and sodium hypochlorite (bleaching lye).


For further information move to the following topics:

Chlor-Alkali-Electrolysis

The Chemical Network in Bitterfeld-Wolfen

ChemiePark Bitterfeld-Wolfen

Bitterfeld and surrounding area


Go back Back to top

© Akzo Nobel NV 2002 / Disclaimer